Civil Engineering Academy Dreaming of the Future Growth of the Nature-Friendly Country
It is the strongest in the civil engineering field called the Civil Engineers School, and aims to improve national territory
development and people's interests by creating a cornerstone of the industry. Based on the competitiveness that has participated
in various large-scale projects such as tunnels, railways, bridges, roads, dams, etc., the company aims to achieve a sustainable
future growth of the country as a national territory-based designer.
In addition, the company has established itself as a leader in the high value-added construction industry by
constructing energy infrastructure such as power plants and plants, and has various construction experiences in the plant
industry such as the Shin-Kori Nuclear Power Plant and the Yeosu Oil Tank
Shingori Nuclear Power Plant Unit 5 Zone Main Facility Construction (#6AB 2&C4, TGB)
Structural Engineering 2 Zone of Sin-Gori Nuclear Power Plant 5 and 6 (#5 AB 2&4, CPB)
Structural work 3 Zone of Sin-Gori Units 5/6 (#5TGB,AACDG,CCW,ESW)
TangJeoong SDC New Product Factory Concrete works In N-PJT FAB (B ZONE)
Yosu Oil Tank Terminal Civil Construction
Out of Sin-Gori Nuclear Power Plant Unit 1 and 2, the permanent drainage construction project of the earthworks construction (CP-C3)
Among the construction work for Hyundai Steel's integrated steel mill, the construction of furnace facilities, the engineering work for coke and Hwaseong plants, and the construction of railroad construction sites.
| Project Name | Location | Period | Client | Contractor | Amount(KRW) |
|---|---|---|---|---|---|
| Drainage, packaging and reclamation work during construction of tar/slag head and raw material pier (5000 ton grade) in Dangjin plant | Dangjin | 06.2008~06.2009 | Hyundai Steel Co., Ltd | Hyundai MCO Co., Ltd | 1,215,390,000 |
| Hyundai Steel Water Drainage Soil and Earth Retaining Work during Water Drainage/Drainage Termination Treatment Plant | Dangjin | 08.2007~02.2009 | Hyundai Steel Co., Ltd | Hyundai Rotem Co., Ltd. | 1,466,850,000 |
| Yeonggwang Nuclear Power Plant Unit 5-6 | Younggwang | 07.1996~12.2000 | Korea Electric Power Corporation | Hyundai E&C | 15,044,010,000 |
| Thermal power plant construction work Donghae | Donghae | 08.1995~12.1997 | Korea Electric Power Corporation | SK E&C, Sungung E&C | 7,462,380,000 |
| Yeocheon V-1-2 Oil-Competitioning Base Construction | Yeoncheon | 05.1994~07.1996 | Oil development corporation | Hyundai E&C | 9,408,850,000 |
| Taean Thermal Power Plant 1 and 2 Construction | Taean | 08.1993~07.1996 | Korea Electric Power Corporation | Hyundai E&C | 692,872,000 |